45 kVA Perkins Diesel Generator – 1103A-33TG1
Prime-rated 45 kVA (50 kVA standby) 50 Hz diesel generator set powered by a Perkins 1103A-33TG1 engine. Leroy Somer TAL-A42-H alternator, DEIF SGC 120 controller, water-cooled.
45kVA Perkins 1103A-33TG1 Diesel Generator
The 45kVA Perkins 1103A-33TG1 is a 50 Hz diesel generating set rated at 45 kVA (36 kW) prime and 50 kVA (40 kW) standby at 1500 rpm. It pairs the Perkins 1103A-33TG1 engine with a Leroy Somer TAL-A42-H alternator and a DEIF SGC 120 controller, with a 400V three-phase output. It is supplied as a complete, factory-assembled generating set with the engine, alternator and control panel mounted on a common base frame.
Perkins 1103A-33TG1: 3.3-litre 3-cylinder vertical in-line engine with direct injection
The 1103A-33TG1 is a 3.3-litre, 3-cylinder vertical in-line engine with a bore and stroke of 105 × 127 mm. 3.3 litre three-cylinder turbocharged engine with direct injection. 1100A build for markets without EPA/EU emissions requirements; able to meet TA Luft. The cooling system is rated for ambient temperatures up to 55°C. Lube oil capacity is 8.3 litres and the cooling system holds 10.2 litres.
Who is this for
Applications:
- Standby power for small commercial premises, shops and offices
- Prime power for site cabins, welfare units and small construction sites
- Backup power for pumps, farm buildings and telecom equipment
Industries:
- Construction and site services
- Agriculture and farming
- Retail and small commercial premises
- Telecommunications
- Events and temporary installations
- Small workshops and light industry
Who is this for
The 45 kVA Perkins 1103A-33TG1 suits buyers who need a compact 50 Hz generating set for small sites: contractors powering site cabins and tools, facilities managers backing up shops, offices and small commercial units, and operators of pumps, farm buildings or telecom equipment where a few tens of kVA is enough.
Typical applications
- Providing 45 kVA prime power as the main source for a site without a reliable grid connection.
- Supplying 50 kVA standby power to a facility on 50 Hz supply during a utility outage.
- Automatic mains failure (AMF) backup, with the DEIF SGC 120 starting the set and transferring load when the mains fails.
- Powering site cabins, welfare units and small tools on a construction site.
- Backup power for telecom cabinets, alarm systems and small IT loads.
- Supplying farm buildings, livestock sheds or irrigation pumps away from the grid.
- Running at a steady load as the primary power source for a remote operation, sized on the prime rating.
- Temporary power for events or short-term projects where the grid connection is limited.
How to install and commission
Step 1: Prepare a level, load-rated base for the set, which measures 2,300 × 1,000 × 1,250 mm in its canopy version and weighs 749 kg. Allow at least one metre of clearance on all sides for maintenance and airflow.
Step 2: Fit vibration isolation between the base frame and the foundation, and connect the exhaust to the silencer using flexible bellows, routed away from air intakes and occupied areas. Silencer supplied: residential grade muffler.
Step 3: Connect the fuel supply, filtration and return line, sizing the supply for at least 11.7 L/h, the highest published consumption for this set. Prime the fuel system fully before the first start.
Step 4: Check the alternator connection matches the site voltage (400V, 50 Hz) and connect the output to the distribution board through a correctly rated main circuit breaker, with neutral and earth connected to the site earthing design.
Step 5: Fill the cooling system to its 10.2-litre capacity with a 50/50 mix of ethylene glycol and water, check all hoses, and confirm the level again at operating temperature.
Step 6: Commission the DEIF SGC 120: set the auto/manual start mode, the mains failure (AMF) settings, engine and generator protection limits, and start/stop timers from the front panel or configuration software.
Step 7: Run a staged load test at 25%, 50%, 75% and 100% of rated load, recording voltage, frequency, oil pressure and coolant temperature at each step.
Load sizing guidance
Add up the connected load in kW and divide by the power factor (typically 0.8) to get the kVA requirement, then add at least 20% margin so the set does not run above about 80% of its rating for long periods. Motors started direct-on-line draw several times their running current, so check the peak kVA when the largest motor starts, not just the running load. For prime power, aim to keep the load between 30% and 80% of the 45 kVA prime rating; long periods at very light load can cause wet stacking and should be avoided with load management or a load bank.
Common specification errors
- Using the standby rating for continuous duty: The 50 kVA standby rating is for emergency use during a mains failure. A set that runs every day as the main power source should be sized on its 45 kVA prime rating.
- Ordering for the wrong frequency: This set is rated at 50 Hz / 1500 rpm. A site on 60 Hz supply needs a different specification, and ratings change with speed.
- Mixing up the voltage: Confirm the site voltage (400V) and phase arrangement before ordering, so the alternator is connected and the AVR set correctly at the factory.
- Underestimating motor starting current: Starting several large motors at once without soft starters or variable speed drives can cause a deep voltage dip and trip the generator protection.
- Ignoring altitude and temperature derating: The cooling system’s limiting ambient temperature is up to 55°C. Hotter or higher sites see reduced output, so confirm the derated figures with CMT Power before specifying.
- Leaving the transfer arrangement out of the design: The DEIF SGC 120 can run automatic mains failure changeover, but only works with correctly rated and wired mains and generator breakers or a transfer switch. Include it in the electrical design from the start.
Safety and regulatory considerations
Install the set in line with ISO 8528 for generating set performance and IEC 60034 for the alternator, and follow local wiring regulations for the connection to the site supply. Keep the exhaust away from air intakes and occupied spaces, provide adequate ventilation for cooling and combustion air, and store fuel in a bunded tank where required. An open set installed outdoors needs a suitable enclosure for weather protection. Emissions: 1100A unit for territories that do not require EPA or EU emissions compliance; able to meet TA Luft. Check the rules that apply to your site, particularly for mobile or temporary use.
Maintenance schedule
| Interval | Service Task |
|---|---|
| Daily (before start) | Check engine oil level (8.3 L capacity), coolant level (10.2 L system), fuel level, battery voltage and the DEIF SGC 120 status indicators |
| Weekly | Inspect for fuel, oil and coolant leaks; check the air filter restriction indicator; run the set off load briefly if it is on standby duty |
| 500 hours | Change engine oil and filters; replace fuel filters and drain the water separator; inspect drive belts and hoses |
| Every 6 months | Check battery condition and charging; clean the radiator core; check alternator and control panel connections |
| Annual | Full service to the engine manufacturer’s schedule; load bank test at 75% or more of rated load; review controller protection settings |
| Every 2 years | Drain and refill the coolant; electrical insulation check on the alternator; review maintenance records for warranty compliance |
Frequently Asked Questions
Q: What is the difference between the prime power rating and the standby power rating on this generator?
The prime rating of 45 kVA (36 kW) is the output the set can supply for unlimited hours to a varying load when it is the main power source. The standby rating of 50 kVA (40 kW) is for emergency use during a mains failure, with no overload allowed. Running a set on its standby rating as a prime power source overloads the engine and shortens its life.
Q: Is this a 50 Hz or a 60 Hz generator?
This set is rated at 50 Hz, running at 1500 rpm, with a 400V three-phase output. The ratings above apply at 50 Hz; a 60 Hz site needs a different specification.
Q: What fuel system and governor does the 1103A-33TG1 use?
The 1103A-33TG1 uses direct injection; rotary type fuel pump. Governor: electronic; governing class ISO 8528-5.
Q: Which alternator is fitted, and what voltage does it supply?
The set uses a Leroy Somer TAL-A42-H alternator: single bearing, brushless and self-excited, with class H insulation, an R150 AVR, and IP23 protection. It is connected for 400V at 50 Hz, with voltage regulation of +/- 0.8%.
Q: What is the fuel consumption of the 1103A-33TG1 at different loads?
At prime rating, fuel consumption is 10.7 L/h at 100% load, 8.2 L/h at 75%, 5.83 L/h at 50% and 3.49 L/h at 25%. At full standby rating it is 11.7 L/h. Fuel should meet EN 590 or an equivalent national diesel specification.
Q: What are the recommended service intervals for the 1103A-33TG1?
Follow the engine manufacturer’s service schedule (500-hour oil change intervals for this engine): oil and filter changes, fuel filter replacement and water separator draining at each service, with coolant replacement every two years or as the coolant type requires. Lube oil capacity is 8.3 litres. An annual load bank test at 75% or more of rated load helps prevent wet stacking on lightly loaded standby sets.
Q: What does the DEIF SGC 120 controller do?
The DEIF SGC 120 is a compact single genset controller with a full-graphics display. It covers automatic and manual start, mains failure (AMF) operation, engine and generator protection, event logging, and USB and RS-485 communication.
Q: What certifications does this generator carry, and what about emissions?
The set carries: Manufactured in facilities certified to ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; Generating set manufactured in accordance with ISO 8528-1 to -12; Engine performance to ISO 3046, BS 5514, DIN 6271; Alternator performance to NEMA MG1, BS 5000, DIN EN, IEC 60034; Circuit breaker to IEC 60947-2. Emissions: 1100A unit for territories that do not require EPA or EU emissions compliance; able to meet TA Luft. Check the emissions rules for your site, particularly for mobile or temporary use.
Q: Can CMT Power deliver and commission a 45kVA generator to a live project?
CMT Power supplies generating sets to live projects and arranges shipping and logistics internationally. For projects with a fixed date, contact the CMT Power team at enquiries@cmtpower.com or +44 (0)330 700 3377 to confirm availability, lead time and the commissioning and load testing support for your site.
Q: What warranty and options are available?
Warranty: Prime equipment: 2000 running hours or 12 months; standby equipment: 500 running hours or 12 months, whichever occurs first, against manufacturing defects. Wearing parts (filters), incorrect operation and back-up genset maintenance failures are excluded. Options include: Alternator: anti-condensation heater; Alternator: PMG + AVR; Alternator: double bearing alternator; Alternator: RTDs for bearing and winding; Control system: AMF / parallel; Control system: remote annunciators; Control system: 4-pole manual/motorised circuit breaker; ATS: contactor or breaker type; ATS: motorised changeover type; Start battery: nickel-cadmium; Start battery: maintenance-free; Start battery: battery charger and selector switch; Start battery: charging current meter; Exhaust muffler: residential, critical or hospital grade; Other voltages available: 120/208, 277/480, 120/240; Available in 60 Hz for all voltage ratings. Silencer: Residential grade muffler.
Have a project that needs power?
Our team can advise on the right generator for your application, capacity requirements and delivery timeline.