400 kVA Perkins Diesel Generator – 2206A-E13TAG3
Prime-rated 400 kVA (450 kVA standby) 50 Hz diesel generator set powered by a Perkins 2206A-E13TAG3 engine. Leroy Somer TAL-A46-H alternator, DSE 7310 controller, water-cooled.
400kVA Perkins 2206A-E13TAG3 Diesel Generator
The 400kVA Perkins 2206A-E13TAG3 is a 50 Hz diesel generating set rated at 400 kVA (320 kW) prime and 450 kVA (360 kW) standby at 1500 rpm. It pairs the Perkins 2206A-E13TAG3 engine with a Leroy Somer TAL-A46-H alternator and a DSE 7310 controller, with a 400V three-phase output. It is supplied as a complete, factory-assembled generating set with the engine, alternator and control panel mounted on a common base frame.
Perkins 2206A-E13TAG3: 12.5-litre 6-cylinder vertical in-line engine
The 2206A-E13TAG3 is a 12.5-litre, 6-cylinder vertical in-line engine with a bore and stroke of 130 × 157 mm. Mechanically actuated, electronically controlled unit injectors with carefully matched turbocharging for good fuel atomisation and economy. Developed from the heavy-duty 2000 Series base using finite element analysis for low oil usage and low wear. The cooling system is rated for ambient temperatures up to 55°C. Lube oil capacity is 40 litres and the cooling system holds 51.4 litres.
Who is this for
Applications:
- Standby power for large commercial and industrial facilities
- Prime power for remote or weak-grid industrial sites
- Backup power for hospitals, process plants and critical loads
Industries:
- Manufacturing and process plants
- Mining and quarrying
- Oil and gas facilities
- Healthcare campuses
- Water and wastewater treatment
- Construction and infrastructure projects
Who is this for
The 400 kVA Perkins 2206A-E13TAG3 is specified for large loads on 50 Hz supply where a single generating set needs to carry a whole building or process. It serves electrical engineers, project managers and procurement teams at industrial sites, large commercial and healthcare facilities, and infrastructure projects.
Typical applications
- Providing 400 kVA prime power as the main source for a site without a reliable grid connection.
- Supplying 450 kVA standby power to a facility on 50 Hz supply during a utility outage.
- Automatic mains failure (AMF) backup, with the DSE 7310 starting the set and transferring load when the mains fails.
- Backing up a process plant or large building where a power cut would stop production or critical services.
- Prime power during the construction phase of an infrastructure project.
- Supporting a site during planned grid maintenance or connection upgrades.
- Running at a steady load as the primary power source for a remote operation, sized on the prime rating.
- Temporary power for events or short-term projects where the grid connection is limited.
How to install and commission
Step 1: Prepare a level, load-rated base for the set, which measures 4,800 × 1,850 × 2,550 mm in its canopy version and weighs 3,050 kg. Allow at least one metre of clearance on all sides for maintenance and airflow.
Step 2: Fit vibration isolation between the base frame and the foundation, and connect the exhaust to the silencer using flexible bellows, routed away from air intakes and occupied areas. Silencer supplied: residential grade muffler (critical and hospital grade optional).
Step 3: Connect the fuel supply, filtration and return line, sizing the supply for at least 90 L/h, the highest published consumption for this set. Prime the fuel system fully before the first start.
Step 4: Check the alternator connection matches the site voltage (400V, 50 Hz) and connect the output to the distribution board through a correctly rated main circuit breaker, with neutral and earth connected to the site earthing design.
Step 5: Fill the cooling system to its 51.4-litre capacity with a 50/50 mix of ethylene glycol and water, check all hoses, and confirm the level again at operating temperature.
Step 6: Commission the DSE 7310: set the AMF parameters, engine and generator protection limits and start/stop timers, and check the alarm and event logs over USB.
Step 7: Run a staged load test at 25%, 50%, 75% and 100% of rated load, recording voltage, frequency, oil pressure and coolant temperature at each step.
Load sizing guidance
Add up the connected load in kW and divide by the power factor (typically 0.8) to get the kVA requirement, then add at least 20% margin so the set does not run above about 80% of its rating for long periods. Motors started direct-on-line draw several times their running current, so check the peak kVA when the largest motor starts, not just the running load. For prime power, aim to keep the load between 30% and 80% of the 400 kVA prime rating; long periods at very light load can cause wet stacking and should be avoided with load management or a load bank.
Common specification errors
- Using the standby rating for continuous duty: The 450 kVA standby rating is for emergency use during a mains failure. A set that runs every day as the main power source should be sized on its 400 kVA prime rating.
- Ordering for the wrong frequency: This set is rated at 50 Hz / 1500 rpm. A site on 60 Hz supply needs a different specification, and ratings change with speed.
- Mixing up the voltage: Confirm the site voltage (400V) and phase arrangement before ordering, so the alternator is connected and the AVR set correctly at the factory.
- Underestimating motor starting current: Starting several large motors at once without soft starters or variable speed drives can cause a deep voltage dip and trip the generator protection.
- Ignoring altitude and temperature derating: The cooling system’s limiting ambient temperature is up to 55°C. Hotter or higher sites see reduced output, so confirm the derated figures with CMT Power before specifying.
- Leaving the transfer arrangement out of the design: The DSE 7310 can run automatic mains failure changeover, but only works with correctly rated and wired mains and generator breakers or a transfer switch. Include it in the electrical design from the start.
Safety and regulatory considerations
Install the set in line with ISO 8528 for generating set performance and IEC 60034 for the alternator, and follow local wiring regulations for the connection to the site supply. Keep the exhaust away from air intakes and occupied spaces, provide adequate ventilation for cooling and combustion air, and store fuel in a bunded tank where required. The controller front panel is rated IP65. An open set installed outdoors needs a suitable enclosure for weather protection. Emissions: Does not comply with harmonised international regulated emissions limits. Check the rules that apply to your site, particularly for mobile or temporary use.
Maintenance schedule
| Interval | Service Task |
|---|---|
| Daily (before start) | Check engine oil level (40 L capacity), coolant level (51.4 L system), fuel level, battery voltage and the DSE 7310 status indicators |
| Weekly | Inspect for fuel, oil and coolant leaks; check the air filter restriction indicator; run the set off load briefly if it is on standby duty |
| Engine manufacturer’s oil service interval | Change engine oil and filters; replace fuel filters and drain the water separator; inspect drive belts and hoses |
| Every 6 months | Check battery condition and charging; clean the radiator core; check alternator and control panel connections |
| Annual | Full service to the engine manufacturer’s schedule; load bank test at 75% or more of rated load; review controller protection settings |
| Every 2 years | Drain and refill the coolant; electrical insulation check on the alternator; review maintenance records for warranty compliance |
Frequently Asked Questions
Q: What is the difference between the prime power rating and the standby power rating on this generator?
The prime rating of 400 kVA (320 kW) is the output the set can supply for unlimited hours to a varying load when it is the main power source. The standby rating of 450 kVA (360 kW) is for emergency use during a mains failure, with no overload allowed. Running a set on its standby rating as a prime power source overloads the engine and shortens its life.
Q: Is this a 50 Hz or a 60 Hz generator?
This set is rated at 50 Hz, running at 1500 rpm, with a 400V three-phase output. The ratings above apply at 50 Hz; a 60 Hz site needs a different specification.
Q: What fuel system and governor does the 2206A-E13TAG3 use?
The 2206A-E13TAG3 uses mechanically actuated, electronically controlled unit fuel injectors with full authority electronic control; direct injection. Governor: electronic, ISO 8528-5 class G2 with isochronous capability.
Q: Which alternator is fitted, and what voltage does it supply?
The set uses a Leroy Somer TAL-A46-H alternator: single bearing, brushless and self-excited, with class H insulation, an R150 AVR, and IP23 protection. It is connected for 400V at 50 Hz, with voltage regulation of ±0.8%.
Q: What is the fuel consumption of the 2206A-E13TAG3 at different loads?
At prime rating, fuel consumption is 81 L/h at 100% load, 62 L/h at 75%, 42 L/h at 50%. At full standby rating it is 90 L/h. Fuel should meet EN 590 or an equivalent national diesel specification.
Q: What are the recommended service intervals for the 2206A-E13TAG3?
Follow the engine manufacturer’s service schedule: oil and filter changes, fuel filter replacement and water separator draining at each service, with coolant replacement every two years or as the coolant type requires. Lube oil capacity is 40 litres. An annual load bank test at 75% or more of rated load helps prevent wet stacking on lightly loaded standby sets.
Q: What does the DSE 7310 controller do?
The DSE 7310 is an automatic mains failure (AMF) controller with a back-lit graphic LCD, engine and generator protection, alarm and hours logs, and USB communication. Its front panel is rated IP65.
Q: What certifications does this generator carry, and what about emissions?
The set carries: Manufactured in facilities certified to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 (UKAS, TÜV); Built in accordance with ISO 8528-1 to 8528-12; Engine performance to ISO 3046, BS 5514, DIN 6271; Alternator performance to NEMA MG1, BS 5000, DIN EN, IEC 60034; Circuit breaker complies with IEC 60947-2; Engine ratings to ISO 8528/1, ISO 3046/1, BS 5514/1, DIN 6271. Emissions: Does not comply with harmonised international regulated emissions limits. Check the emissions rules for your site, particularly for mobile or temporary use.
Q: Can CMT Power deliver and commission a 400kVA generator to a live project?
CMT Power supplies generating sets to live projects and arranges shipping and logistics internationally. For projects with a fixed date, contact the CMT Power team at enquiries@cmtpower.com or +44 (0)330 700 3377 to confirm availability, lead time and the commissioning and load testing support for your site.
Q: What warranty and options are available?
Warranty: Prime equipment: 2,000 running hours or 12 months; standby equipment: 500 running hours or 12 months, whichever occurs first, against manufacturing defects. Wearing parts (filters), incorrect operation and back-up genset maintenance failures are excluded. See cmtpower.com for details. Options include: Alternator: anti-condensation heater; Alternator: PMG + AVR; Alternator: double bearing alternator; Alternator: RTDs for bearing and winding; Control system: AMF / parallel; Control system: remote annunciators; Control system: 4-pole manual / motorised circuit breaker; ATS: contactor or breaker type; ATS: motorised changeover type; Start battery: nickel-cadmium battery; Start battery: maintenance-free battery; Start battery: battery charger and selector switch; Start battery: charging current meter; Exhaust muffler: residential, critical or hospital grade; Available for voltages 120/208, 277/480, 120/240; Available in 60 Hz for all voltage ratings. Silencer: Residential grade muffler (critical and hospital grade optional).
Have a project that needs power?