2045 kVA Cummins Diesel Generator – QSK60G4
2045 kVA prime (2250 kVA standby) diesel generating set. Cummins QSK60-G4 V16 engine, Mecc Alte 6.3 kV alternator, Deep Sea control system. Open set (acoustic canopy optional). CE certified, ISO 8528 Class G3.
2045kVA Cummins QSK60-G4 Diesel Generator
The 2045kVA Cummins QSK60-G4 is a high-output diesel generating set rated at 2045 kVA (1636 kW) prime and 2250 kVA (1800 kW) standby at 50 Hz, with a continuous base load rating of 1650 kVA (1325 kW). Configured with a 6.3 kV Mecc Alte alternator, this generating set is specified for large industrial installations, infrastructure projects, and critical power schemes where medium voltage distribution is required. Manufactured in ISO 9001 certified facilities and CE marked, it suits projects across Europe, the Middle East, Africa, Asia-Pacific, and the Americas.
Cummins QSK60-G4: high-output Quantum series performance for large-scale generation
The QSK60-G4 belongs to Cummins’ Quantum series, a V16 turbocharged and aftercooled engine with 60.2 litres of displacement, engineered specifically for G-Drive generator applications rather than adapted from automotive or industrial platforms. The Quantum series incorporates Cummins High Pressure Injection (HPI) PT fuel management, controlled by an off-engine G-Drive Governor Control System (GCS), delivering precise fuel metering and full electronic engine protection across all load conditions from 25% to 100%. At prime rating the QSK60-G4 produces 1636 kW (2045 kVA) and at standby 1800 kW (2250 kVA), with the electronic governor certified to ISO 8528 Part 1 Class G3 for frequency stability under transient load changes.
Who is this for
Applications:
- Large infrastructure and utility-scale standby or prime power generation
- Industrial facilities requiring medium voltage (6.3 kV) on-site generation
- Data centre primary generator backup integrated into medium voltage switchgear
Industries:
- Oil and gas upstream and downstream facilities
- Mining and heavy extraction operations
- Large-scale construction and civil infrastructure projects
- Data centres and critical power facilities
- Utilities and power transmission
- Large hospital and healthcare campuses
Who is this for
The 2045kVA Cummins QSK60-G4 is specified for projects requiring large-scale generation at medium voltage (6.3 kV), where a single high-output generating set is preferred over multiple paralleled smaller units. It serves electrical engineers, project directors, and procurement teams managing infrastructure builds, industrial facilities, and critical power systems at the 2 MVA scale. Typical buyers include EPC contractors on large construction projects, facilities engineers at data centres and industrial campuses, and engineering teams at oil and gas or mining operations where continuous or emergency prime power at medium voltage is essential.
Typical applications
- Providing 2045 kVA prime power as the primary generation source for an offshore platform, mining compound, or remote industrial facility where grid connection is unavailable or insufficient.
- Supplying 2250 kVA standby emergency power to a large hospital complex or healthcare campus where loss of power to critical systems is not permissible under any circumstances.
- Serving as the primary backup generating set for a hyperscale or co-location data centre requiring medium voltage generation integrated into the facility’s MV switchgear room.
- Acting as the standby power source for a water treatment plant or wastewater facility where continuous operation of pumping and treatment equipment is required under utility failure conditions.
- Delivering prime power during the construction phase of a large infrastructure project (bridge, tunnel, or highway) where grid supply is unavailable across the active site.
- Operating in a load-sharing parallel configuration with a second QSK60-G4 or equivalent generating set to provide redundant N+1 generation for a critical power scheme.
- Providing base load continuous power (COP rating: 1650 kVA / 1325 kW) to an industrial manufacturing facility or process plant as the primary generation source in an off-grid or weak-grid location.
- Supporting a utility-scale temporary power scheme during scheduled grid maintenance or infrastructure upgrade works affecting a large network distribution area.
How to install and commission
Step 1: Prepare the installation site to accommodate the generator footprint of 4,979 x 2,494 mm with a minimum one metre maintenance clearance on all sides. Engineer the floor slab to a minimum of 9,685 kg static load plus dynamic load allowance; engage a structural engineer for mounting pad and vibration isolation requirements specific to the installation.
Step 2: Install vibration isolation mounts between the generator base frame and the slab. Connect the exhaust system to the installed silencer (9 dB attenuation industrial silencer, or 25 dB residential silencer, delivered loose), using flexible bellows to decouple vibration from the structure, with adequate provision for thermal expansion.
Step 3: Connect the bulk fuel system to the generator’s fuel inlet, including a day tank, primary and secondary filtration, and a fuel return line. Size the fuel supply pipework to deliver a minimum of 437 L/h at full standby load. Prime the fuel system completely to eliminate air pockets before first engine start.
Step 4: Connect the 6.3 kV alternator output to the site’s medium voltage switchgear via appropriately rated MV cabling. Connect the neutral to the site earth system in accordance with the installation’s earthing design. Verify the connection to the 4-pole main circuit breaker (if specified) before energising.
Step 5: Fill the cooling system with a 50% ethylene glycol / 50% water mixture to the 490-litre coolant capacity. Check all hose connections, verify coolant level at operating temperature, and test the water jacket heater (if installed) to confirm pre-heat operation before a cold-start scenario.
Step 6: Commission the Deep Sea Electronics (DSE) control module: configure AMF (automatic mains failure) parameters, set engine protection thresholds, verify start and stop sequencing, and test automatic transfer switch (ATS) operation if installed. Programme remote monitoring outputs as required by the site building management or SCADA system.
Step 7: Perform a staged load test: start unloaded, apply 25% rated load, then step through 50%, 75%, and 100%. Record voltage, frequency, fuel consumption, coolant temperature, and oil pressure at each stage. Verify load acceptance in accordance with NFPA 110 requirements and issue a load test certificate on completion.
Load sizing guidance
To size correctly, calculate total connected load in kW, then divide by the site power factor (typically 0.8) to determine required kVA. Apply a minimum 20% margin above the calculated running load to accommodate transient load steps and to avoid sustained operation above 80% rated capacity. For loads containing large electric motors (pumps, compressors, chillers), apply a motor starting current multiplier of 2.5 to 6 times running current (depending on starting method) to calculate the peak kVA demand during motor start; the generator must absorb this starting current without unacceptable voltage dip. For prime power applications, maintaining load between 30% and 80% of prime kW rating gives the best balance of fuel efficiency and engine longevity; sustained operation below 30% load risks wet stacking and should be avoided by load management or standby resistive load banks.
Common specification errors
- Specifying to standby kVA for a continuous prime power application: The standby rating (2250 kVA) is limited to 200 hours per year in emergency use only; applying it as a prime power rating will result in engine overloading, warranty invalidation, and significantly reduced service life.
- Overlooking the 6.3 kV medium voltage output: This generator outputs at 6.3 kV, not 400 V. Connection to a standard LV distribution system without a correctly specified and installed step-down transformer will cause immediate damage to electrical equipment; the MV interface and transformer must be part of the project design from the outset.
- Underestimating motor starting current: Large pumps, compressors, or process motors starting across-the-line draw 5 to 6 times running current; even at 2045 kVA, simultaneous starting of multiple large motor loads without soft-starters or variable speed drives can cause significant voltage dip and potential generator protection trip.
- Ignoring altitude and temperature derating: Output ratings are stated at standard conditions (sea level, 50°C limiting ambient per the Cummins specification). At high-altitude or high-ambient-temperature sites, available output will be reduced; confirm corrected output with CMT Power’s technical team before committing to specification.
- Omitting ATS design from the project scope: A standby generator without a correctly specified and commissioned automatic transfer switch cannot guarantee automatic power restoration on mains failure; ATS specification must be integrated into the electrical design from the start of the project.
- Under-sizing the day tank and bulk fuel supply: At 437 L/h under full standby load, runtime calculations must account for realistic replenishment logistics; undersized day tanks will cause fuel starvation during an extended power outage before replenishment can occur.
Safety and regulatory considerations
This generating set must be installed in compliance with BS 7698 / ISO 8528 for generating set performance and IEC 60034 for alternator ratings. For installations serving emergency power systems in healthcare or data centre environments, NFPA 110 provides the applicable standard for start time, load acceptance, and periodic testing requirements. The 6.3 kV alternator output requires that all MV cabling, switchgear, and earthing comply with applicable national regulations for medium voltage electrical systems; IEC 61936-1 (power installations exceeding 1 kV) is the relevant international standard. Where this generator is deployed in a hazardous area (ATEX Zone 1 or Zone 2), additional engine and alternator specifications are required; consult CMT Power before specifying for any hazardous area installation. For outdoor open-set installation, an appropriately IP-rated enclosure must be provided; the base generating set does not carry an IP rating independent of its housing.
Maintenance schedule
| Interval | Service Task |
|---|---|
| Daily (before start) | Check engine oil level (280 L capacity), coolant level (490 L system), fuel level, battery voltage, and DSE control module status indicators |
| Weekly | Inspect for fuel, oil, and coolant leaks; check air filter restriction indicator; verify water jacket heater operation; test manual start sequence |
| 250 hours | Engine oil and filter change (spin-on full-flow filter); fuel filter and water separator replacement; inspect drive belts and hoses |
| 500 hours | Full coolant system inspection; injector check; turbocharger inspection; battery capacity test; verify alternator excitation and voltage regulation (±1%) |
| Annual | Full service per Cummins G-Drive schedule; load bank test to minimum 75% rated load; coolant flush and refill assessment; review DSE module protection settings and firmware |
| 2 years | Coolant system drain and full refill; full electrical insulation check; review and update all maintenance records for warranty compliance |
Frequently Asked Questions
Q: What is the difference between the prime power rating and the standby power rating on this generator?
The prime power rating (PRP) of 2045 kVA / 1636 kW is the maximum output this generator can sustain for an unlimited number of annual hours in a variable load application where it serves as the primary power source. The standby rating (ESP) of 2250 kVA / 1800 kW is for use during a utility supply failure only, limited to 200 hours per year maximum, and no overload is permissible on standby rating. A continuous power rating (COP) of 1650 kVA / 1325 kW applies where the generator runs at constant load for unlimited hours. A 10% overload for up to one hour in every twelve is permissible at prime rating in accordance with ISO 3046. Specifying to standby rating for a continuous prime power application will result in engine overloading, warranty invalidation, and premature failure.
Q: What is the Cummins HPI fuel system and how does it affect performance in demanding applications?
The HPI (High Pressure Injection) PT fuel system is Cummins’ full authority electronic fuel management for the Quantum series, managed by an off-engine G-Drive Governor Control System (GCS) controller mounted in the genset control panel. Unlike mechanical injection systems, the HPI-PT provides precise control of fuel delivery at every load condition, improving combustion efficiency and enabling faster load acceptance response under transient demand. The electronic governor meets ISO 8528 Part 1 Class G3 accuracy, ensuring frequency stability under load steps critical to sensitive electrical equipment. This architecture also supports an Engine Protection package that reduces the risk of undetected fault conditions during long-duration standby operation.
Q: What is this generator NOT suitable for?
This generating set outputs at 6.3 kV (medium voltage) and cannot be connected directly to a standard 400 V three-phase distribution system without a correctly specified step-down transformer, which must be designed and installed separately. At 2045 kVA prime rating, this generating set is not suited to temporary event power, small commercial premises, or applications below 1000 kVA; more appropriate options in those cases would be the Cummins 500 kVA, 750 kVA, or 1000 kVA generating sets.
Q: What are the site and installation requirements for the QSK60-G4 in open set configuration?
The open set configuration measures 4,979 x 2,494 x 3,201 mm and weighs 9,685 kg dry, requiring installation in a purpose-built generator room or enclosed structure providing adequate ventilation for the cooling system air flow of 34 m³/s and fan power of 44 kWm. A minimum clearance of one metre on all sides is recommended for maintenance access, with additional clearance at the alternator end for exciter access and inspection. Floor loading must be engineered to accommodate the static and dynamic loads, and the installation must accommodate coolant connections for the 490-litre two-pump two-loop (2P2L) cooling system. Where acoustic requirements apply, the optional sound attenuated canopy should be specified at the time of order.
Q: What is the fuel consumption of the QSK60-G4 at different load levels, and how should I size the fuel system?
At prime rating, fuel consumption is 394 L/h at 100% load, 291 L/h at 75% load, 200 L/h at 50% load, and 114 L/h at 25% load. At full standby rating, consumption is 437 L/h; at continuous power (COP) at 100% load, it is 320 L/h. These figures are taken directly from the Cummins G-Drive specification sheet and should be used as the basis for day tank sizing, bulk fuel storage calculations, and runtime planning. Fuel should meet EN 590 (diesel) or equivalent national specification; sub-standard fuel quality will damage the HPI injection system and void the warranty.
Q: What are the recommended service intervals for the QSK60-G4 engine?
The QSK60-G4 uses spin-on fuel filters with an integrated water separator and a full-flow spin-on lube oil filter, with an oil sump capacity of 280 litres. Engine oil and filter changes should follow the Cummins G-Drive schedule, typically every 250 operating hours or annually (whichever occurs first), with full coolant system servicing every two years or at the Cummins-specified interval for the installed coolant type. Annual load bank testing to a minimum of 75% rated load is strongly recommended to prevent wet stacking and to verify governor and protective relay operation.
Q: What automatic start and monitoring capabilities does the Deep Sea control system provide?
The Deep Sea Electronics (DSE) automatic start module provides automatic mains failure detection and engine start sequencing, with an engine protection package covering oil pressure, coolant temperature, overspeed, and under/over voltage and frequency conditions. The DSE module supports remote monitoring and can be integrated with site SCADA or building management systems via Modbus or other supported protocols, depending on the specific DSE model supplied. For applications requiring automatic transfer switching (ATS) or synchronisation with a second generator or the mains supply, a compatible DSE paralleling controller or dedicated ATS panel must be specified at the time of order.
Q: What certifications does this generator carry, and what emissions requirements should I consider for my installation?
The generating set carries CE marking and is designed and manufactured in ISO 9001 certified facilities. The electronic governor is certified to ISO 8528 Part 1 Class G3, and load acceptance complies with NFPA 110 requirements applicable to healthcare and emergency power system projects. Stationary emergency standby generator applications in most jurisdictions are exempt from EU Stage V requirements; however, mobile or temporary hire applications within the European Union may be subject to emissions certification, so confirm the regulatory position for your specific installation context with CMT Power before purchase.
Q: Can CMT Power deliver and commission a 2045kVA generator to a live project with a critical power timeline?
CMT Power maintains stock of high-kVA generating sets for deployment to live projects and coordinates international shipping and logistics for projects across Europe, the Middle East, Africa, Asia-Pacific, and the Americas. For critical power projects with firm commissioning deadlines, contact the CMT Power engineering team at enquiries@cmtpower.com or +44 (0)330 700 3377 to confirm current availability, lead times, and the scope of commissioning and load testing support available for your site.
Q: What assurance does CMT Power provide on the long-term reliability of the QSK60-G4 generating set?
The QSK60-G4 is backed by Cummins’ G-Drive Integrated Design programme, in which every component of the generator package is specifically developed and tested for G-Drive applications rather than adapted from other platforms. CMT Power supplies these generating sets with Cummins installation Quality Assurance (IQA) certification, and the warranty extends to five years for standby applications and two years for prime power applications. CMT Power’s technical team provides pre-sale specification support, site survey assistance, and post-commissioning service coordination to ensure the installation meets the technical and regulatory requirements of the project.