1275 kVA Cummins Diesel Generator – KTA50G3
Prime-rated 1275 kVA (1400 kVA standby) diesel generator set powered by a Cummins KTA50G3 engine. Meccalte alternator with 6.3 kV medium voltage output, Deep Sea control system, water-cooled. Electronic governor, ISO 8528 Part 1 Class G3. CE, ISO 9001, ISO 14001 and ISO 45001 designed and manufactured.
1275kVA Cummins KTA50G3 Diesel Generator
The 1275kVA Cummins KTA50G3 is a diesel generating set rated at 1275 kVA (1020 kW) prime and 1400 kVA (1120 kW) standby at 50 Hz, with a continuous base load rating of 1048 kVA (839 kW). Configured with a 6.3 kV Meccalte alternator, this generating set is specified for industrial installations and infrastructure projects where medium voltage distribution is required in a more compact footprint than CMT Power’s larger KTA50 based sets. Manufactured to ISO 9001, ISO 14001 and ISO 45001 and CE marked, it suits projects across a range of industrial and infrastructure applications.
Cummins KTA50G3: single pump Coolpac cooling in a compact KTA50 platform
The KTA50G3 is a 16-cylinder, 50.3-litre engine using Cummins PT direct injection, governed electronically to ISO 8528 Part 1 Class G3 for tighter frequency and voltage recovery than a mechanically governed engine of similar size. Unlike the twin pump Coolpac system fitted to CMT Power’s KTA50-G8 and KTA50-GS8 based sets, the KTA50G3 uses a single pump, two loop Coolpac arrangement holding 152 litres of coolant, giving a smaller footprint and lighter dry weight for a similar power class. At prime rating the KTA50G3 produces 1020 kW (1275 kVA) and at standby 1120 kW (1400 kVA), with a base/continuous rating of 839 kW (1048 kVA).
Who is this for
Applications:
- Standby power for facilities already fed from a medium voltage supply
- Prime power in off-grid or weak-grid industrial sites
- Peak shaving and load support on 6.3 kV distribution networks
Industries:
- Mining and heavy extraction operations
- Oil and gas upstream and downstream facilities
- Utilities and power transmission
- Large commercial and institutional campuses with medium voltage infrastructure
- Water treatment and industrial process plants
- Construction and civil infrastructure projects requiring temporary medium voltage power
Who is this for
The CMTP1275C is specified for projects requiring generation at medium voltage (6.3 kV) in a more compact package than CMT Power’s larger KTA50-G8 or QSK60-G4 based sets. It serves electrical engineers, project directors, and procurement teams managing industrial facilities, mining operations, and infrastructure builds where medium voltage distribution is already in place or planned. Typical buyers include EPC contractors, facilities engineers at industrial campuses, and engineering teams at mining or processing sites where prime or standby power at medium voltage is required without the footprint or fluid capacity of a larger set.
Typical applications
- Providing 1275 kVA prime power as the primary generation source for a mining compound or remote industrial facility where grid connection is unavailable or insufficient.
- Supplying 1400 kVA standby emergency power to an industrial facility or commercial campus where loss of power to critical systems is not permissible.
- Serving as a backup generating set for a facility with existing 6.3 kV switchgear, avoiding the cost of a dedicated low voltage generator interface.
- Acting as the standby power source for a water treatment plant or wastewater facility where continuous operation of pumping and treatment equipment is required under utility failure conditions.
- Delivering prime power during the construction phase of an infrastructure project where grid supply is unavailable across the active site.
- Operating in a load-sharing parallel configuration with a second KTA50G3 or equivalent generating set to provide redundant generation for a critical power scheme.
- Providing base load continuous power (COP rating: 1048 kVA / 839 kW) to an industrial manufacturing facility as the primary generation source in an off-grid or weak-grid location.
- Supporting a utility-scale temporary power scheme during scheduled grid maintenance affecting a medium voltage distribution area.
How to install and commission
Step 1: Prepare the installation site to accommodate the generator footprint of 3,275 x 2,000 mm with a minimum one metre maintenance clearance on all sides. Engineer the floor slab to a minimum of 5,900 kg static load plus dynamic load allowance; engage a structural engineer for mounting pad and vibration isolation requirements specific to the installation.
Step 2: Install vibration isolation mounts between the generator base frame and the slab. Connect the exhaust system to the installed silencer (9 dB attenuation industrial silencer, or 25 dB residential silencer, delivered loose), using flexible bellows to decouple vibration from the structure, with adequate provision for thermal expansion.
Step 3: Connect the bulk fuel system to the generator’s fuel inlet, including a day tank, primary and secondary filtration, and a fuel return line. Size the fuel supply pipework to deliver a minimum of 293 L/h at full standby load. Prime the fuel system completely to eliminate air pockets before first engine start.
Step 4: Connect the 6.3 kV alternator output to the site’s medium voltage switchgear via appropriately rated MV cabling, carried out by a licensed medium voltage electrician. Connect the neutral to the site earth system in accordance with the installation’s earthing design. Verify the connection to the 4-pole main circuit breaker (if specified) before energising.
Step 5: Fill the single pump, two loop Coolpac cooling system with a 50% ethylene glycol / 50% water mixture to the 152-litre coolant capacity. Check all hose connections, verify coolant level at operating temperature, and test the water jacket heater (if installed) to confirm pre-heat operation before a cold-start scenario.
Step 6: Commission the Deep Sea Electronics (DSE) control module: configure AMF (automatic mains failure) parameters, set engine protection thresholds, verify start and stop sequencing, and test automatic transfer switch (ATS) operation if installed. Programme remote monitoring outputs as required by the site building management or SCADA system.
Step 7: Perform a staged load test: start unloaded, apply 25% rated load, then step through 50%, 75%, and 100%. Record voltage, frequency, fuel consumption, coolant temperature, and oil pressure at each stage. Verify load acceptance in accordance with NFPA 110 requirements and issue a load test certificate on completion.
Load sizing guidance
To size correctly, calculate total connected load in kW, then divide by the site power factor (typically 0.8) to determine required kVA. Apply a minimum 20% margin above the calculated running load to accommodate transient load steps and to avoid sustained operation above 80% rated capacity. For loads containing large electric motors (pumps, compressors, chillers), apply a motor starting current multiplier of 2.5 to 6 times running current (depending on starting method) to calculate the peak kVA demand during motor start; the generator must absorb this starting current without unacceptable voltage dip. For prime power applications, maintaining load between 30% and 80% of prime kW rating gives the best balance of fuel efficiency and engine longevity; sustained operation below 30% load risks wet stacking and should be avoided by load management or standby resistive load banks.
Common specification errors
- Specifying to standby kVA for a continuous prime power application: The standby rating (1400 kVA) is limited to emergency use only; applying it as a prime power rating will result in engine overloading, warranty invalidation, and significantly reduced service life.
- Overlooking the 6.3 kV medium voltage output: This generator outputs at 6.3 kV, not 400 V. Connection to a standard LV distribution system without a correctly specified and installed step-down transformer will cause immediate damage to electrical equipment; the MV interface and transformer must be part of the project design from the outset.
- Assuming the same cooling capacity as CMT Power’s larger KTA50 sets: The KTA50G3 uses a smaller, single pump 152-litre Coolpac system, not the 496-litre twin pump system fitted to the KTA50-G8 and KTA50-GS8. Do not carry over coolant capacity or footprint figures from those units when planning the installation.
- Underestimating motor starting current: Large pumps, compressors, or process motors starting across-the-line draw 5 to 6 times running current; simultaneous starting of multiple large motor loads without soft-starters or variable speed drives can cause significant voltage dip and potential generator protection trip.
- Ignoring altitude and temperature derating: Output ratings are stated at standard conditions (sea level, 55.6°C limiting ambient per the Cummins specification at 50 Hz). At high-altitude or high-ambient-temperature sites, available output will be reduced; confirm corrected output with CMT Power’s technical team before committing to specification.
- Omitting ATS design from the project scope: A standby generator without a correctly specified and commissioned automatic transfer switch cannot guarantee automatic power restoration on mains failure; ATS specification must be integrated into the electrical design from the start of the project.
Safety and regulatory considerations
This generating set must be installed in compliance with BS 7698 / ISO 8528 for generating set performance and IEC 60034 for alternator ratings. For installations serving emergency power systems, NFPA 110 provides the applicable standard for start time, load acceptance, and periodic testing requirements. The 6.3 kV alternator output requires that all MV cabling, switchgear, and earthing comply with applicable national regulations for medium voltage electrical systems; IEC 61936-1 (power installations exceeding 1 kV) is the relevant international standard. Where this generator is deployed in a hazardous area (ATEX Zone 1 or Zone 2), additional engine and alternator specifications are required; consult CMT Power before specifying for any hazardous area installation. For outdoor open-set installation, an appropriately IP-rated enclosure must be provided; the base generating set does not carry an IP rating independent of its housing.
Maintenance schedule
| Interval | Service Task |
|---|---|
| Daily (before start) | Check engine oil level (177 L capacity), coolant level (152 L system), fuel level, battery voltage, and DSE control module status indicators |
| Weekly | Inspect for fuel, oil, and coolant leaks; check air filter restriction indicator; verify water jacket heater operation; test manual start sequence |
| 250 hours | Engine oil and filter change (spin-on full-flow filter); fuel filter and water separator replacement; inspect drive belts and hoses |
| 500 hours | Full coolant system inspection; injector check; turbocharger inspection; battery capacity test; verify alternator excitation and voltage regulation (±1%) |
| Annual | Full service per Cummins schedule; load bank test to minimum 75% rated load; coolant flush and refill assessment; review DSE module protection settings and firmware |
| 2 years | Coolant system drain and full refill; full electrical insulation check; review and update all maintenance records for warranty compliance |
Frequently Asked Questions
Q: What is the difference between the prime power rating and the standby power rating on this generator?
The prime power rating (PRP) of 1275 kVA / 1020 kW is the maximum output this generator can sustain for an unlimited number of annual hours in a variable load application where it serves as the primary power source. The standby rating (ESP) of 1400 kVA / 1120 kW is for use during a utility supply failure only, limited to emergency use, and no overload is permissible on standby rating. A continuous power rating (COP) of 1048 kVA / 839 kW applies where the generator runs at constant load for unlimited hours. A 10% overload for up to one hour in every twelve is permissible at prime rating in accordance with ISO 3046. Specifying to standby rating for a continuous prime power application will result in engine overloading, warranty invalidation, and premature failure.
Q: What makes the KTA50G3’s governor and cooling system different from CMT Power’s other KTA50-based generators?
The KTA50G3 uses an electronic governor certified to ISO 8528 Part 1 Class G3, giving tighter frequency and voltage recovery under transient load changes than a mechanically governed engine. Its Coolpac cooling system uses a single pump, two loop design with 152 litres of coolant, distinct from the twin pump, 496-litre system fitted to CMT Power’s KTA50-G8 and KTA50-GS8 based generators. This smaller cooling package contributes to the KTA50G3’s more compact footprint and lighter dry weight for its power class.
Q: What is this generator NOT suitable for?
This generating set outputs at 6.3 kV (medium voltage) and cannot be connected directly to a standard 400 V three-phase distribution system without a correctly specified step-down transformer, which must be designed and installed separately. At 1275 kVA prime rating, this generating set is not suited to temporary event power, small commercial premises, or applications requiring low voltage output at the generator terminals; more appropriate options in those cases would be one of CMT Power’s low voltage generating sets.
Q: What are the site and installation requirements for the KTA50G3 in open set configuration?
The open set configuration measures 3,275 x 2,000 x 2,200 mm and weighs approximately 5,900 kg dry, requiring installation in a purpose-built generator room or enclosed structure providing adequate ventilation for the cooling system air flow of 30.3 m³/s and fan power of 21.0 kWm at 50 Hz. A minimum clearance of one metre on all sides is recommended for maintenance access, with additional clearance at the alternator end for exciter access and inspection. Floor loading must be engineered to accommodate the static and dynamic loads, and the installation must accommodate coolant connections for the 152-litre single pump, two loop cooling system. Where acoustic requirements apply, the optional sound attenuated canopy should be specified at the time of order.
Q: What is the fuel consumption of the KTA50G3 at different load levels, and how should I size the fuel system?
At prime rating, fuel consumption is 261 L/h at 100% load, 199 L/h at 75% load, 139 L/h at 50% load, and 76 L/h at 25% load. At full standby rating, consumption is 293 L/h; at continuous power (COP) at 100% load, it is 216 L/h. These figures are taken directly from the Cummins engineering specification and are matched by CMT Power’s own datasheet for this unit. Fuel should meet EN 590 (diesel) or equivalent national specification; sub-standard fuel quality will damage the PT injection system and void the warranty.
Q: What are the recommended service intervals for the KTA50G3 engine?
The KTA50G3 uses spin-on fuel filters with an integrated water separator and a full-flow spin-on lube oil filter, with an oil sump capacity of 177 litres. Engine oil and filter changes should follow the Cummins service schedule, typically every 250 operating hours or annually (whichever occurs first), with full coolant system servicing every two years or at the Cummins-specified interval for the installed coolant type. Annual load bank testing to a minimum of 75% rated load is strongly recommended to prevent wet stacking and to verify governor and protective relay operation.
Q: What automatic start and monitoring capabilities does the Deep Sea control system provide?
The Deep Sea Electronics (DSE) automatic start module provides automatic mains failure detection and engine start sequencing, with an engine protection package covering oil pressure, coolant temperature, overspeed, and under/over voltage and frequency conditions. The DSE module supports remote monitoring and can be integrated with site SCADA or building management systems, depending on the specific DSE model supplied. For applications requiring automatic transfer switching (ATS) or synchronisation with a second generator or the mains supply, a compatible DSE paralleling controller or dedicated ATS panel must be specified at the time of order.
Q: What certifications does this generator carry, and what emissions requirements should I consider for my installation?
The generating set carries CE marking and is designed and manufactured to ISO 9001, ISO 14001 and ISO 45001. The electronic governor is certified to ISO 8528 Part 1 Class G3, and load acceptance complies with NFPA 110 requirements. Stationary emergency standby generator applications in most jurisdictions are exempt from EU Stage V requirements; however, mobile or temporary hire applications within the European Union may be subject to emissions certification, so confirm the regulatory position for your specific installation context with CMT Power before purchase.
Q: Can CMT Power deliver and commission a 1275kVA generator to a live project with a critical power timeline?
CMT Power maintains stock of medium voltage generating sets for deployment to live projects and coordinates shipping and logistics for projects internationally. For critical power projects with firm commissioning deadlines, contact the CMT Power engineering team at enquiries@cmtpower.com or +44 (0)330 700 3377 to confirm current availability, lead times, and the scope of commissioning and load testing support available for your site.
Q: What assurance does CMT Power provide on the long-term reliability of the KTA50G3 generating set?
CMT Power supplies these generating sets with Cummins installation Quality Assurance (IQA) certification, and the warranty extends to five years for standby applications and two years for prime power applications. CMT Power’s technical team provides pre-sale specification support, site survey assistance, and post-commissioning service coordination to ensure the installation meets the technical and regulatory requirements of the project.
Have a project that needs power?
Our team can advise on the right generator for your application, capacity requirements and delivery timeline.