100 kVA Lister Petter Diesel Generator – LP443G4
In Stock

100 kVA Lister Petter Diesel Generator – LP443G4

Prime-rated 100 kVA (110 kVA standby) 50 Hz diesel generator set powered by a Lister Petter LP443G4 engine. Leroy Somer TAL A44 alternator, Deep Sea controller, water-cooled.

Prime Power100 kVA
Standby Power110 kVA
EngineLister Petter LP443G4
AlternatorLeroy Somer
EnclosureOpen Skid
Output Voltage400V (230/400V), 3 Phase
Quantity needed:
Talk to an Expert →

100kVA Lister Petter LP443G4 Diesel Generator

The 100kVA Lister Petter LP443G4 is a 50 Hz diesel generating set rated at 100 kVA (80 kW) prime and 110 kVA (88 kW) standby at 1500 rpm. It pairs the Lister Petter LP443G4 engine with a Leroy Somer TAL A44 alternator and a Deep Sea controller, with a 400V (230/400V) three-phase output. It is supplied as a complete, factory-assembled generating set with the engine, alternator and control panel mounted on a common base frame.

Lister Petter LP443G4: 4.3-litre 4-cylinder engine with direct injection

The LP443G4 is a 4.3-litre, 4-cylinder engine with a bore and stroke of 105 × 124 mm, turbocharged, air-to-air intercooled. The limiting ambient temperature for the cooling system is 55°C.

Who is this for

Applications:

  • Standby power for commercial buildings, clinics and schools
  • Prime power for construction sites and remote facilities
  • Backup power for pumping stations, cold stores and light industrial units

Industries:

  • Commercial property and offices
  • Healthcare and education
  • Light manufacturing
  • Water and wastewater
  • Construction and infrastructure
  • Agriculture and food processing
Prime power
100 kVA / 80 kW
Standby power
110 kVA / 88 kW
Continuous power
Not published for this engine kVA / Not published for this engine kW
Power factor
0.8
Engine
Lister Petter LP443G4
Engine speed
1500 RPM
Alternator
Leroy Somer
Controller
Deep Sea
Cooling
Water-cooled with engine-mounted radiator. Limiting ambient temperature 55°C.
Output voltage
400V (230/400V), 3 Phase
Frequency
50 Hz
Phases
Three Phase
Enclosure
Open Skid
Dimensions
Not published for this set
Weight
Not published for this set
Certifications
CE
100% load
23 L/h
75% load
17.1 L/h
50% load
11.8 L/h

Who is this for

The 100 kVA Lister Petter LP443G4 is specified for mid-sized loads on 50 Hz supply: commercial buildings, clinics and schools, light industrial units, pumping stations and construction sites. Typical buyers are electrical contractors, facilities and estates managers, and site managers who need dependable standby or prime power without the footprint of a large industrial set.

Typical applications

  • Providing 100 kVA prime power as the main source for a site without a reliable grid connection.
  • Supplying 110 kVA standby power to a facility on 50 Hz supply during a utility outage.
  • Automatic mains failure (AMF) backup, with the Deep Sea starting the set and transferring load when the mains fails.
  • Backing up a pumping station or cold store where equipment must keep running through a power cut.
  • Temporary power for a commercial fit-out or construction phase before the permanent supply is connected.
  • Standby power for a clinic, school or care home.
  • Running at a steady load as the primary power source for a remote operation, sized on the prime rating.
  • Temporary power for events or short-term projects where the grid connection is limited.

How to install and commission

Step 1: Confirm the complete set footprint and weight with CMT Power before civil design. Allow at least one metre of clearance on all sides for maintenance and airflow.

Step 2: Fit vibration isolation between the base frame and the foundation, and connect the exhaust to the silencer using flexible bellows, routed away from air intakes and occupied areas. Silencer supplied: 9 dB(A) attenuation industrial silencer; 25 dB(A) residential silencer available (delivered loose).

Step 3: Connect the fuel supply, filtration and return line, sizing the supply for at least 23 L/h, the highest published consumption for this set. Prime the fuel system fully before the first start.

Step 4: Check the alternator connection matches the site voltage (400V (230/400V), 50 Hz) and connect the output to the distribution board through a correctly rated main circuit breaker, with neutral and earth connected to the site earthing design.

Step 5: Fill the cooling system with a 50/50 mix of ethylene glycol and water, check all hoses, and confirm the level again at operating temperature.

Step 6: Commission the Deep Sea control module: set the automatic start parameters, engine and generator protection limits and start/stop timers, and confirm the alarms and shutdowns work.

Step 7: Run a staged load test at 25%, 50%, 75% and 100% of rated load, recording voltage, frequency, oil pressure and coolant temperature at each step.

Load sizing guidance

Add up the connected load in kW and divide by the power factor (typically 0.8) to get the kVA requirement, then add at least 20% margin so the set does not run above about 80% of its rating for long periods. Motors started direct-on-line draw several times their running current, so check the peak kVA when the largest motor starts, not just the running load. For prime power, aim to keep the load between 30% and 80% of the 100 kVA prime rating; long periods at very light load can cause wet stacking and should be avoided with load management or a load bank.

Common specification errors

  • Using the standby rating for continuous duty: The 110 kVA standby rating is for emergency use during a mains failure. A set that runs every day as the main power source should be sized on its 100 kVA prime rating.
  • Ordering for the wrong frequency: This set is rated at 50 Hz / 1500 rpm. A site on 60 Hz supply needs a different specification, and ratings change with speed.
  • Mixing up the voltage: Confirm the site voltage (400V (230/400V)) and phase arrangement before ordering, so the alternator is connected and the AVR set correctly at the factory.
  • Underestimating motor starting current: Starting several large motors at once without soft starters or variable speed drives can cause a deep voltage dip and trip the generator protection.
  • Ignoring altitude and temperature derating: The cooling system’s limiting ambient temperature is 55°C. Hotter or higher sites see reduced output, so confirm the derated figures with CMT Power before specifying.
  • Leaving the transfer arrangement out of the design: The Deep Sea can run automatic mains failure changeover, but only works with correctly rated and wired mains and generator breakers or a transfer switch. Include it in the electrical design from the start.

Safety and regulatory considerations

Install the set in line with ISO 8528 for generating set performance and IEC 60034 for the alternator, and follow local wiring regulations for the connection to the site supply. Keep the exhaust away from air intakes and occupied spaces, provide adequate ventilation for cooling and combustion air, and store fuel in a bunded tank where required. An open set installed outdoors needs a suitable enclosure for weather protection. Check the emissions rules that apply to your site, particularly for mobile or temporary use.

Maintenance schedule

Interval Service Task
Daily (before start) Check engine oil level, coolant level, fuel level, battery voltage and the Deep Sea status indicators
Weekly Inspect for fuel, oil and coolant leaks; check the air filter restriction indicator; run the set off load briefly if it is on standby duty
Engine manufacturer’s oil service interval Change engine oil and filters; replace fuel filters and drain the water separator; inspect drive belts and hoses
Every 6 months Check battery condition and charging; clean the radiator core; check alternator and control panel connections
Annual Full service to the engine manufacturer’s schedule; load bank test at 75% or more of rated load; review controller protection settings
Every 2 years Drain and refill the coolant; electrical insulation check on the alternator; review maintenance records for warranty compliance

Frequently Asked Questions

Q: What is the difference between the prime power rating and the standby power rating on this generator?

The prime rating of 100 kVA (80 kW) is the output the set can supply for unlimited hours to a varying load when it is the main power source. The standby rating of 110 kVA (88 kW) is for emergency use during a mains failure, with no overload allowed. Running a set on its standby rating as a prime power source overloads the engine and shortens its life.

Q: Is this a 50 Hz or a 60 Hz generator?

This set is rated at 50 Hz, running at 1500 rpm, with a 400V (230/400V) three-phase output. The ratings above apply at 50 Hz; a 60 Hz site needs a different specification.

Q: What fuel system and governor does the LP443G4 use?

The LP443G4 uses direct injection. Governor: electronic.

Q: Which alternator is fitted, and what voltage does it supply?

The set uses a Leroy Somer TAL A44 alternator: single bearing, brushless and self-excited, with class H insulation. It is connected for 400V (230/400V) at 50 Hz, with voltage regulation of ±1%.

Q: What is the fuel consumption of the LP443G4 at different loads?

At prime rating, fuel consumption is 23 L/h at 100% load, 17.1 L/h at 75%, 11.8 L/h at 50% and 6.5 L/h at 25%. Fuel should meet EN 590 or an equivalent national diesel specification.

Q: What are the recommended service intervals for the LP443G4?

Follow the engine manufacturer’s service schedule: oil and filter changes, fuel filter replacement and water separator draining at each service, with coolant replacement every two years or as the coolant type requires. An annual load bank test at 75% or more of rated load helps prevent wet stacking on lightly loaded standby sets.

Q: What does the Deep Sea controller do?

The Deep Sea automatic start control module monitors the engine and alternator, starts and stops the set, and shuts it down on faults such as low oil pressure, high coolant temperature and overspeed. Confirm the exact module model and its communication options with CMT Power at the quotation stage.

Q: What certifications does this generator carry, and what about emissions?

The set carries: CE certification available. The engine manufacturer’s data does not state an emissions certification for this engine. Check the emissions rules for your site, particularly for mobile or temporary use.

Q: Can CMT Power deliver and commission a 100kVA generator to a live project?

CMT Power supplies generating sets to live projects and arranges shipping and logistics internationally. For projects with a fixed date, contact the CMT Power team at enquiries@cmtpower.com or +44 (0)330 700 3377 to confirm availability, lead time and the commissioning and load testing support for your site.

Q: What warranty and options are available?

Warranty: 5 years for standby application; 2 years for prime application. Options include: Engine water jacket heater 230V; Sound attenuated canopy; Alternator heater; PMG kit. Silencer: 9 dB(A) attenuation industrial silencer; 25 dB(A) residential silencer available (delivered loose).

2045 kVA Cummins Diesel Generator – QSK60G4
1500 kVA Cummins Diesel Generator – KTA50GS8
1400 kVA Cummins Diesel Generator – KTA50G8

Have a project that needs power?

Our team can advise on the right generator for your application, capacity requirements and delivery timeline.